Every shoot, in order. Done, in edit, and still to get.
One section per shoot day: what it was for, what came out of it, what's still coming. Finished pieces and unedited picks are real. Anything grey and dashed hasn't been shot or built yet. Under every real photo and video there's Plan this: say where it should go, add a talking point, send it. It lands with Zeb the same minute.
Three buttons under everything real.
Unedited picks are straight from the camera: no colour, no retouching, no crop. One of each kind of shot. If one should go, say so under it.
Cherokee Place, the finished house.
The first shoot after Flyover came on: a walk through the finished Leawood house, the features one at a time, and the drone from November. The kitchen was the photo set that day; the other rooms are in the Reels.
Finished pieces 15
Unedited picks The kitchen, 8 of 90 frames. The drone frames from November and January.
Still to get
Felton Residence, the addition.
The addition and remodel: the steel beam that came in by hand, the kitchen features, the basement finish. The before and after waits on the homeowners' own before photos.
Finished pieces 5
Full length, in the shared Drive folder
Full length, in the shared Drive folderUnedited picks 16 of 201 frames, from the raw files.
Still to get
Lee's Summit pool, the plan.
First visit to the pool project: the slide from the driveway, the hot tub, the sunken fire pit, the eight-month plan.
Finished pieces 1
The Prairie Village kitchen.
The kitchen, mudroom and pantry remodel, start to finish in ten weeks, with the owners out of town for most of it. The clearest process story on the account.
Finished pieces 7
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderCarousels



The studio session.
Forty-seven minutes on camera at the studio: how you got here, how a job is estimated, what projects cost, how involved clients get. The founder story and the budget question both live here.
Finished pieces 7
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderCarousels

Still to get
Acreage build, footings.
Footings in red clay, 182 piers, the expansive layer that pushed the dig deeper. Chapter one of the series.
Finished pieces 8
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderCarousels

Motion The piers graphic.
Still to get
Acreage build, foundation walls and the pour.
The brick ledge the crew built by hand, the survey rebar every height comes from, 300 yards of concrete before lunch. Grant introduced.
Finished pieces 7
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderCarousels


Still to get
Lee's Summit pool, shotcrete.
The seventh truck, 70 yards, 45,000 gallons, 28 days before tile. Jason from Clearwater explaining his own trade, and Tom introduced, at scale.
Finished pieces 10
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderStill to get
Acreage build, slab and forms.
The slab finishing, the bee attack, the forms. The first photo day at the acreage.
Finished pieces 3
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderUnedited picks 14 of 127 frames.
Acreage build, framing.
Subfloor to walls in a week. The container at 95 degrees, ZIP R3, the grinder pump, the 9'6" basement, the mock-up wall after the storm. The 15-minute site tour is episode one of the series.
Finished pieces 9
Full length on YouTube and in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderUnedited picks 14 of 156 frames.
Still to get
The ride-along.
A Friday in the truck: the window set at Leawood, the acreage walk, the brick house with the scaffold stairs. The trapezoid window, the screen porch that became a four-season room, moving past can lights, showing homeowners their options.
Finished pieces 6
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderUnedited picks 12 of 89 frames, plus the drone over the acreage.
Carousels


Still to get
Acreage build, the walkthrough with Dylan.
Dylan introduced, then 38 minutes of the two of you solving the house in real time: the shade pockets, the fireplace clearance, the NanaWall, the door that shrank. The best two-hander on the account.
Finished pieces 5
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderUnedited picks 20 of 251 frames.
Still to get
Day to day.
The pieces that don't belong to one shoot: bloopers, the Fourth of July, the finish-quality piece.
Finished pieces 4
Full length, in the shared Drive folder
Full length, in the shared Drive folder
Full length, in the shared Drive folderCarousels


The full day.
Three blocks: the framing walk before drywall, the story in the truck, BuilderTrend and headshots at the office. The plan is its own page.
Still to get
The milestones.
The things anyone watching the series would notice changed. Each one is a short visit and a chapter.
Still to get
The office day.
Headshots against the office wall, the team page photos, the accountant story sitting down, BuilderTrend on a dummy job. An hour.
Still to get
The other jobs.
The Mission Hills garage teardown with two bedrooms above. The brick house in KCMO as it moves. The Mission Hills primary suite, finished. The pool with water in it. And the Q1 project with the national architect, which you said you're anxious to document.
Still to get
Motion graphics.
The moving parts of the brand. The logo animation and the Reel cover are built and live on the Brand page. Lower thirds and the series title treatment follow.